|
in dollars) | architect = HKS, Inc. NBBJ Eppstein Uhen Architects | project_manager = International Facilities Group, LLC.〔(【引用サイトリンク】title=Miller Park )〕 | structural engineer = Arup/Flad Structural Engineers | services engineer = Arup/Kapur & Associates〔 | general_contractor = HCH Miller Park Joint Venture (Hunt Construction; Clark Construction; Hunzinger Co.)〔(Miller Park - Ballparks.com )〕 | main_contractors = | former_names = | tenants = Milwaukee Brewers (MLB) (2001–present) | seating_capacity = 41,900〔 | record_attendance = 46,218〔(Saturday, September 6, 2003, 6:05PM, Miller Park )〕 | dimensions = Left Field - Left-Center - (Not Posted) Center Field - Right-Center - (Not Posted) Right Field - Backstop - }} Miller Park is a ballpark located in Milwaukee, Wisconsin. It is home to the Milwaukee Brewers and was completed in 2001 as a replacement for Milwaukee County Stadium. The park is located just southwest of the intersection of Interstate 94 and Miller Park Way (Wisconsin Highway 175). The title sponsor is the Miller Brewing Company. Miller's contract with the stadium was for $40 million, and runs until 2020.〔(ESPN.com: SPORTSBUSINESS - Stadium naming rights )〕 Miller Park features North America's only fan-shaped convertible roof, which can open and close in less than 10 minutes. Large panes of glass allow natural grass to grow, augmented with heat lamp structures wheeled out across the field during the off-season. ==Construction== Miller Park is one of the largest construction projects in Wisconsin history. It was built with $290 million of public funds from a 0.1% sales tax that began January 1, 1996, and is scheduled for retirement upon completion, sometime around 2017. The tax is applied on purchases in Milwaukee County and four surrounding counties: Ozaukee, Racine, Washington, and Waukesha. The tax was controversial, in part because of the notion of using public funds for a privately owned sports team. The state senator who cast the deciding vote in the funding bill, George Petak of Racine, lost a recall election based on his vote for the stadium.〔(Miller Park a testament to America's pastime )〕 Groundbreaking took place on November 9, 1996, in a parking lot behind County Stadium. Originally scheduled to open in 2000, Miller Park's construction was delayed after three construction workers were killed in an accident. A Lampson Transi-lift crane 3 (nicknamed "Big Blue"), brought in to build the roof, collapsed while lifting a 450-ton roof section, during windy conditions, on July 14, 1999, killing three workers. A camera crew was filming construction of the stadium on that day and captured the collapse on video as it occurred. Repair work and an investigation forced the Brewers to stay in County Stadium for one more year, until 2001. There was some talk of having the Brewers move to Miller Park in the middle of 2000, but it was determined that too many corners would need to be cut for it to be a realistic possibility. The stadium has a retractable roof, built in a unique fan-shaped style, with the roof panels opening and closing simultaneously in a sweeping manner from the first- and third-base sides toward center field. The complex and massive roof was a significant factor in the $392 million cost of the stadium. It allows the seating area to be heated 30° warmer than the outside temperature when closed, allowing games to be played in inclement weather and in more comfortable conditions than an open air stadium. The idea of the stadium having a retractable roof had been considered right away in the initial design, as to help counter the unpredictable Wisconsin weather in the early spring and late autumn. The design team was appointed after a design competition in the mid-1990s. The architectural concept for the stadium was developed by the Los Angeles based sports and entertainment team NBBJ, who worked closely with a Los Angeles-based team of engineers Arup, who were responsible for all stages of the structural and building services engineering design for the stadium, with the exception of the mechanical mechanisms that move the roof structure. The original versions of these mechanisms were designed by Mitsubishi Heavy Industries America as part of a design and build contract, but they have now been replaced by new designs after their failure. The executive architect responsible for the delivery of the final stadium design was a Dallas-based team of HKS, Inc. In addition to these major players there were a significant contributions from local teams including Eppstein Uhen Architects. The stadium design followed the trend of retro-designed ballparks with current amenities that began in 1992 with Oriole Park at Camden Yards in Baltimore, Maryland. The original grass playing surface was installed on March 10, 2001, with County Stadium's surface infield dirt and home plate transplanted into the new stadium. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Miller Park (Milwaukee)」の詳細全文を読む スポンサード リンク
|